Spain’s Nabrawind has developed a way to install exceptionally tall wind turbine towers without bringing an enormous crawler crane to the site.
Its Nabralift system uses a tubular upper tower supported by a three-legged steel structure.
Hydraulic equipment raises the assembled turbine while modular sections are inserted below it near ground level.
Stay updated with continuous reporting from CleanTechnica.